Government Approval – Liaisoning Work
We offer complete liaisoning services, handling the government and DISCOM approvals needed for solar projects. Our team manages documents, load sanctioning, net-metering, and inspections, ensuring smooth approvals across states like UP, MP, Haryana, and Uttarakhand.
Over the last 7 years we made an impact, we have long way to go.
Our ability to navigate complex state-level processes allows us to remove roadblocks and reduce delays. We work closely with DISCOM officials and regulatory bodies to speed up approvals and maintain legal compliance throughout.
At Enernet, our liaisoning excellence is based on:
- Regulatory knowledge across multiple regions
- Systematic document preparation and submission
- Trusted networks with state authorities


What paperwork is needed for solar installation?
We manage all documentation ranging from site clearance and electrical agreements to grid-connection applications.
How do you evaluate the cost of solar repair?
We assess site visit reports, component condition, failure logs, and performance data to provide you with detailed cost estimates.
What is the per‑square‑foot cost of installation?
Installation costs vary depending on system size, mounting type, and location. We conduct a detailed techno-commercial analysis to deliver accurate estimates.
When should battery connections be checked?
We recommend battery checks during routine maintenance (every 6–12 months), or immediately after any drop in energy storage efficiency is noticed.