Our Services

Project Management Consultant

Under a project management contract an engineering contractor will overlook the EPC Contractors work to ensure compliance with client scope of works. Consultation is provided by us to deliver optimal sol. for transportation and forecasting. We starts the construction management process during the preliminary design stage when project planning milestones are established, construction concepts are developed, and the overall plan is prepared.

Over the last 7 Years we made an impact, we have long way to go.

With the application of our knowledge, skills, tools, and techniques to project activities, we help the Investors / Project Developers meet their project requirements by providing services like :

  • Feasibility Study
  • Site & Resource assestssment
  • Technology Feasibility Study for most suitable technology deployment.
  • Design, Development & Optimization of Solar Power Plants
  • Site Development / EPC Help & Selection
  • Techno-Commercial Project due-diligence
Our PMC Service Process

At Enernet, We live by three core values which guide every stage:

  • Integrity
  • Innovation
  • Impact
What paperwork is needed for solar installation?

We manage all documentation ranging from site clearance and electrical agreements to grid-connection applications.

How do you evaluate the cost of solar repair?

We assess site visit reports, component condition, failure logs, and performance data to provide you with detailed cost estimates.

What is the per‑square‑foot cost of installation?

Installation costs vary depending on system size, mounting type, and location. We conduct a detailed techno-commercial analysis to deliver accurate estimates.

When should battery connections be checked?

We recommend battery checks during routine maintenance (every 6–12 months), or immediately after any drop in energy storage efficiency is noticed.

Service Options
1

Documentation Checklist:

We help gather all essential documents like site ownership, load bills, and layout approvals for smooth solar installation processing.
2

Application submission

Our team handles all required form submissions to government bodies and DISCOMs, ensuring zero delays or rejections.
3

Inspection

Site inspections are conducted to assess feasibility, safety, and technical readiness before the installation phase begins.
4

Final Documentation

We compile all necessary documents including inspection reports, installation certificates, performance test results, and net-metering applications.
5

Panel Installation

Certified installers carry out safe and efficient solar panel placement with attention to structure and energy output.
6

Grid connection

We coordinate with local authorities for grid integration, synchronizing the system for power generation and supply.