Solar Plant Installation & Commissioning

We provide professional installation and commissioning services for rooftop and ground-mounted solar systems. With every project, we guide our clients through site assessments, system setup, safety protocols, and final testing to ensure peak performance and regulatory compliance. Our approach simplifies complex procedures and delivers effective, reliable solar energy solutions.

Over the last 7 years we made an impact, we have long way to go.

These principles define how we execute every project—from foundations to final wiring. Our experienced team, streamlined processes, and quality standards help us fulfill the trust clients place in us and ensure each system performs long after handover.

Service Process

At Enernet, our values are embedded in every project phase:

  • We focus on precision and on-time execution.
  • We bring cross-functional expertise to every site.
  • We prioritize safety, scalability, and long-term performance.
Service Options
What paperwork is needed for solar installation?

We manage all documentation ranging from site clearance and electrical agreements to grid-connection applications.

How do you evaluate the cost of solar repair?

We assess site visit reports, component condition, failure logs, and performance data to provide you with detailed cost estimates.

What is the per‑square‑foot cost of installation?

Installation costs vary depending on system size, mounting type, and location. We conduct a detailed techno-commercial analysis to deliver accurate estimates.

When should battery connections be checked?

We recommend battery checks during routine maintenance (every 6–12 months), or immediately after any drop in energy storage efficiency is noticed.

1

Documentation Checklist:

We help gather all essential documents like site ownership, load bills, and layout approvals for smooth solar installation processing.
2

Application submission

Our team handles all required form submissions to government bodies and DISCOMs, ensuring zero delays or rejections.
3

Inspection

Site inspections are conducted to assess feasibility, safety, and technical readiness before the installation phase begins.
4

Final Documentation

We compile all necessary documents including inspection reports, installation certificates, performance test results, and net-metering applications.
5

Panel Installation

Certified installers carry out safe and efficient solar panel placement with attention to structure and energy output.
6

Grid connection

We coordinate with local authorities for grid integration, synchronizing the system for power generation and supply.